|
Installation Made Easy

Click Image for Larger View
With the
Click technique even you can install laminate floors yourself. This saves
considerable expense and after a brief orientation can even be fun. Manufacture
has already prepared everything you will need. But to “Click” successfully a few
simple rules must be followed.
Preparation
Before installation, Laminate flooring
should be stored horizontally in the room for at least 48 hours, unopened in its
original packaging. Before, during and at least three days after installation,
the room should be maintained in the following conditions:
Floor surface: min. 15°C
Air temperature: min.
18°C
Humidity: 50 - 75%
|
Step 1 |
Step 2 |
 |
 |
|
Step 3 |
Step 4 |
 |
 |
|
Step 5 |
Step 6 |
 |
 |
|